The two stage construction utilising 2.8m Precast panels to the four sides with Colorbond sheeting above, features Gable Portal C section buiding with columns and rfters.
Consisting of 12 bays with Colorbond sheeting to walls and Colorbond roof sheeting, these two dedicated storage facilities are mirror images of each other. Containig four units ine each building, all with roller doows installed at both front and rear of the buildings allowing for prime accessibility.