A pre-existing cricket pitch was originally set up for indoor use with plans to have the building completed at a later date. As a result, this project needed to be installed over the top of existing equipment including full Astroturf.
Williams River Steel lined the Astro turf with yellow tongue flooring to protect it from the scissor lifts and scaffold systems.
This full turn-key, structural project with Colorbond roof and walls, included full electrical plus connection from main switch board and plumbing stormwater to existing drainage.